De-rating curves for other storage units by initial capacity
and duration of storage at full output.
Demand side response in the Irish Capacity Remuneration
Mechanism (CRM) is to face de-rating factors already applied to storage
duration limits under new rules confirmed by the country’s electricity market
authority.
For the forthcoming T-1 auction for capacity year 2019/20
the Single Electricity Market (SEM) Committee has ruled that Demand Side Units
(DSUs) with a limited duration for their demand reduction of less than or equal
to 6 hours will be hit with the same de-rating factors used for energy storage.
This ‘Maximum Down Time’ has been judged to be equivalent to
a storage unit’s hours of storage as like short duration batteries, a DSU with
limited demand reduction capabilities “does not deliver the same benefit to
adequacy as a unit that does not limit its dispatch”, according to the SEM
Committee.
These units will therefore have the same de-rating curves
applied as those used for non-pumped storage assets
Out of the 15 responses to the CRM T-1 CY 2019/20
consultation, the SEM Committee says most agreed with the proposals, although
some raised ‘material concerns’ with the use of other storage de-rating factors
being applied to DSUs given they are totally different technologies.
Others claimed the plans also discouraged demand side
response providers from participating with I-SEM and the capacity market by
reducing the revenues which encourage businesses to contribute their capability
to the stability of the system.
The plans have moved ahead of the proposal
put forward in Britain’s capacity market by Scottish Power, which
would see DSR bids using storage as part of its capacity placed in a new
technology class and subject to de-rating factors recently applied to battery
storage.
In response to the Irish decision Tom Palmer, principal
consultant at Cornwall Insight, said: “The Irish Capacity Remuneration Mechanism
for 2019/20 just became a lot more challenging for demand-side response
providers.
“This is a step further than the proposal put forward in GB
Capacity Market by Scottish Power for a Demand Side Response (DSR) Technology
Classes with different minimum durations as that covered just storage.”
Further planning for the future
The SEM Committee has also looked further in planning for
auctions taking place after the T-1 CY2019/20 auction, opting to
change the methodology used to determine de-rating factors for energy
storage.
These will be calculated as a function of both generation
sizes and storage volumes in MW, or duration, given as the maximum number of
hours all units sharing the energy storage (e.g. reservoir) can run
simultaneously at their generation size before recharging.
Storage de-rating factors will be specified in 30 minute
interval up to an energy storage duration of 6.5 hours and kept under periodic
review, while a linear curve will apply to those units with a storage duration
that is not a multiple of 30 minutes, applied between the nearest half-hour
above and below a unit’s storage size.
To this end, an additional technology class is to be created
on an enduring basis for “Other Storage” – not pumped hydro - and will apply
the system wide outage statistics until there is sufficient SEM historical
data.
The SEM Committee has also proposed to allow storage units a
voluntary ‘decreasing tolerance’ (DECTOL) to allow them to continue to access
and deliver other system services outside of the capacity market, thus avoiding
penalties for not meeting their other obligations.
This means they can such units can apply a downward
adjustment to the capacity they submit into the Capacity Market auction to
reduce their exposure to difference payments in order to reflect their commitments
to system services provisions.